Step by step guide
Step 01
Contact us to arrange an initial visit and discuss your project.
Step 02
We’ll talk through your aims and budget, review the site, and take photographs.
Step 03
We prepare a fee proposal outlining services, costs, brief and timescale.
Step 04
Review any queries and confirm the appointment.
Step 05
Hold a more detailed meeting (in person or online), take site measurements, and explore priorities and options.
Step 06
Complete a survey and prepare initial sketch designs. These can be presented as a 3D model you can view digitally, or with us in the office.
Step 07
Refine the design through feedback and discussion, considering options before finalising.
Step 08
Submit the Planning Permission application. Neighbours or the local press may be notified for comments.
Step 09
Liaise with the Planning Officer until a decision is reached (usually within 8-12 weeks). Any conditions must be addressed before work begins.
Step 10
Prepare detailed technical drawings to meet current Building Standards, with details on insulation, heating and safety, and submit for Building Warrant. A structural engineer is usually required; we will guide you through this.
Step 11
Prepare a List of Works and drawings for contractor pricing. Issue to selected contractors. Once planning conditions are discharged and the Building Warrant is approved, construction can begin.
Step 12
Act as Contract Administrator: liaise with the contractor, inspect works, and certify staged payments. A retention is held until completion for added assurance.
Step 13
Completion and final inspection by Building Standards.
Step 14
Move in and enjoy your completed project.
Step 15
At 12 months, we re-inspect and arrange for any defects to be rectified.